Road reconstruction / Case study

Lees Avenue Wentworth Falls Project

Full-depth road reconstruction on a live residential street, with property access restored at the end of every working day.

01 / Overview

Built around the

people who use it.

Lees Avenue is a narrow residential street in Wentworth Falls, serving established homes with direct driveway access to the carriageway. The pavement had reached the end of its service life and required complete reconstruction rather than resurfacing.

Alpha Civil Group delivered bulk excavation and removal of the failed pavement and subgrade, new kerb and gutter, pavement construction, asphalt surfacing and reinstatement of property driveways.

The street was the sole access for the properties along it. The reconstruction therefore had to advance while the road remained in use, with every affected driveway returned to a trafficable condition at the end of each working day.

The project at a glance

Delivery that made a difference.

people who use it.

Full reconstruction
Traffic maintained

Driveway access restored

Residents left without access

02 / Scope of works

From the ground up.

03 / Site constraints

Understanding the challenge.

The street was the only vehicle access for adjoining properties. Staged sections and a trafficable lane kept residents connected to the road network.

Full-depth excavation temporarily cut off driveways. Compacted temporary crossings were rebuilt at the end of every shift, including ahead of weekends.

The street was the only vehicle access for adjoining properties. Staged sections and a trafficable lane kept residents connected to the road network.

04 / Delivery approach

A clear plan. A controlled work face.

Each work section was matched to a day’s productive output, excavated, trimmed, built up and made safe before the next section opened.

Temporary driveway crossings were formed and compacted at the end of each shift, then progressively replaced as the permanent pavement was completed.

Water-filled barriers provided physical separation. Traffic control supported excavation, concrete placement, roadbase deliveries and asphalt operations.

Continuous pavement and asphalt operations extended into the evening where necessary so sections could be finished, compacted and reopened.

Residents received advance notification and updates as the work face progressed, with direct communication for properties affected on each day.

05 / Before & after

The transformation.

Carriageway and kerb reconstruction

lees-13lees-14

Road surface and verge reinstatement

lees-15lees-16

Pavement and drainage line

lees-17lees-18
06 / Construction record

Work in progress.

A closer look at the construction sequence and completed works.

07 / Outcomes

A lasting result.

Case Study 02

Road reserve restoration beside Bondi Public School, with structural works concentrated into a Friday–Saturday window to protect school operations.

Waverley Council · August 2026
 
Concrete footpath

Kerb and gutter

02 Waverley Council

Moore Street Streetscaping

Footpath and public domain works.

BeforeAfter
Before-1After-1
Before-2After-2

01 Waverley Council

Llandaff Avenue

Footpath and public domain works.

Concrete footpath restorations on Llandaff Street and Hollywood Avenue, pram ramp construction, lane closures and night-shift bus stop reconstruction, with night asphalt walkway and road patching.

BeforeAfter
BeforeAfter
Before-1After-1